Test runs

The test runs are carried out after the assembly of each individual component supporting frameworks, drive, step or pallet band, and the controller of the respective safety switch. The software which is on the connected notebook, analyses potential deviations of the pre-set norm values, displays them graphically and saves all results of the respective type number.

Therefore, there will be access to the determined data anytime. Since the tests are carried out on undisguised shoring, it can be carried out immediately for the cause determining any necessary changes and adjustments.