Final quality check

The escalator/ moving walkway will be tested with a 200 point checklist and any possible fault will be simulated, for a final check-up. The individual test points ranges from the control of the gaps, to the simulated handrail breakage, up to a 24 - hour continuous operation of the plant.

The causes of identified faults are analysed and documented in the test report. The data obtained are included in the error cost analysis and process control. If necessary, the affected processes will be adjusted or changed based on the Geyssel quality management manual (“QMH”). Only when all the points from the construction manager or his deputy were labeled with OK, the system will be released.