Technical initial acceptance

The initial assessment is carried out by an authorized expert, before the handover of the system to the operator, owner or principal. Because since 2010, for each product produced from Geyssel a “TÜV Süd” certificate is present, the examination of an escalator or a moving walk usually takes only about an hour. As part of this initial assessment, the check-up log book will be created by Geyssel, which will accompany the plant a lifelong. In the log book of the machine, the static calculations, prototype tests and test of the main components are stored in addition to the technical data and a manual.

Checklist:

  • Declaration of Conformity
  • TÜV certificate
  • Initial acceptance report
  • Technical data
  • Operating manual
  • Braking distance calculation
  • Circuit diagram
  • prototype tests and other reports